What was done
S-Engineering has implemented a complex project on the main ammonia pipeline “Togliatti – Odessa” (total length 2195 km, ammonia pumping 2.5 million tons per year):
- modernization of the distribution system for controlling the technological process of ammonia pumping;
- reconstruction of 34 stations of the lower level of the automated process control system Matra on the route of the ammonia pipeline “Tolyatti – Odessa” (Ukrainian section);
- development and implementation of an independent digital system for recording the operation parameters of the ammonia pumping automation system;
- equipping with a complex of technical security systems.