What was done
- A set of works on carrying out survey work on a gantry loader of the State Enterprise “Dnepro-Bug Sea Port NGZ”.
- Modernization of the existing dust suppression system of the sludge storage: manufacturing and supply of equipment, software development, installation and commissioning.
- Repair of an automated system built on SIMATIC S5.