What was done
The implementation of projects for these TPPs made it possible to increase the reliability and efficiency of power equipment and, as a result, reduce the cost of electricity generation.
Kurakhovskaya TPP:
- A set of works on the reconstruction of electrical equipment of power unit No. 7.
Zuevskaya TPP:
- A set of works on the modernization of the raw coal feeder electric drive.
- Modernization of the thyristor excitation system of a ball-drum mill of several power units.
- Modernization of the control system of the TPP coal dust supply line.
Luhanska TPP:
- A set of works on modernization of the electric drive of dust feeders of power unit No. 13.