What was done
- The productivity of the oil extraction plant FLOAREA SOARELUI SA* (Moldova) increased one and a half times over four years of cooperation with S-Engineering. Such an increase in productivity was due, among other things, to the fact that our specialists implemented a set of works on power supply and automation of the enterprise.
- S-Engineering has completed several projects to modernize the production departments of the OEP. These are an oil extraction shop, an oil press shop and a preparation department, a meal granulation department, and a filtration department. For these sections of the OEP on the power supply system, a solution based on S-Engineering SELAM technology was proposed and implemented.
- A project for the construction of an intermediate storage of silo-type meal is in the process of implementation. For this elevator, we have developed and are implementing a power supply system based on Siemens SIVACON S8 technology with small design 1/2 and ¼ cells.
- A SCADA system was developed and implemented under the modernization project for the automation system of the oil press shop and the preparation area. It coordinates technological processes and product movement, allows you to determine operational performance indicators, monitors the production capacity of Oil Extraction Plant sections and controls quality parameters, calculates shift KPI, etc.