What was done
- Production, supply of switchboard equipment and installation and commissioning to modernize production in order to switch to soybean processing.
- The gas boiler house has been modernized.
- Design documentation has been developed, switchboard equipment for power supply systems has been manufactured and delivered.
- Execution of design work on the reconstruction of the system of external lighting and external lighting of the plant and emergency lighting of the meal warehouse, manufacturing and supply of a lighting control cabinet.
- Execution of design work on the reconstruction of indoor switchgear 35/10 kV.