What was done
- A set of works on the creation of an external ground loop and a lightning protection system for the preparatory workshop of the processing complex for oilseeds: design, supply of equipment and materials, installation and commissioning, laboratory tests.
- A set of works for a 35/6 kV step-down substation for a new oilseed processing complex: development of design documentation, supply of equipment and materials, laboratory tests, installation and commissioning.
- A set of works on commissioning of automated control systems and instrumentation and automation: installation and commissioning of automated control systems and instrumentation of the preparatory workshop of the oil extraction plant.
- A set of works for the supply of equipment and materials, installation and commissioning work on the lighting device for the plant oil neutralization and winterization workshop at the facility – Tropical Oils Transshipment and Processing Complex.
- A set of works on design, software development, manufacture and supply of equipment and materials, installation and commissioning of control cabinets for the grain cleaning and distribution system.