What was done
S-Engineering acted as one of the contractors for the construction of a grain terminal in the port of Yuzhny. This is a joint project of the Ukrainian group MV Cargo and the American corporation Cargill.
For this object, S-Engineering specialists performed:
- design work on the power supply system and power control of the grain terminal;
65 MCC (Motor Control Center) power control panels were manufactured for the grain cleaning and drying unit and the grain silo storage unit with a capacity of 210 thousand tons, according to SIVACON S8 technology using Small Design draw-out modules;
installation and testing of power control panels MCC (Motor Control Center).
Construction work at the site was monitored by technicians from Cargill Corporation and Tebodin, an international engineering consulting company.
According to Sergey Fedorik, curator of the Neptune international project of MV Cargo, “our project management team noted the high professional level of S-Engineering specialists, while the company’s ability to complete the project in a very short time with high quality requirements deserves special attention. inherent in projects of international level”.