Burun Field (ENI)

Burun Field (ENI)

What was done

Burun field, Balkanabat district, Turkmenistan. EPC contract: development and supply of substation SS-22A for the surface production complex project for oil separation and pumping. Production and supply of complete electrical equipment; development of SCADA software for power equipment and ventilation and air conditioning systems; fire alarm and Inergen gas fire extinguishing system.

Power supply system for mobile drilling rigs Gara Altin, Khana:

use of a system with three diesel generator units (DGUs) with synchronization and parallel operation of drilling rigs.

Modernization of the camp’s power supply:

modernization of the camp power supply system with installation of a 6/0.4 kV 1250 kVA modular transformer substation (container type).

Power supply system for the primary oil separation area:

commissioning of a mobile transformer substation with a capacity of 9.3 MVA;
use of an automatic fire extinguishing system and transformer substation dispatching system.

Client:
ENI S.p.A.
Year of cooperation:
2010, 2013, 2015
Country of implementation:
Balkanabat, Turkmenistan
Industry:
Oil and gas