ENOC (UAE). Comprehensive facility modernization projects
What was done
Reconstruction of the power supply system of Khazar Port:
commissioning of three transformer substations with additional power sources in the form of diesel generator units (DGUs), each with a capacity of 910 kVA;
replacement of the port’s cable networks;
reconstruction of the port’s outdoor lighting system using 25-meter lighting masts.
CPF primary oil separation plant:
reconstruction of the 35 kV power supply system with replacement of the 35 kV switchgear by a 52 kV switchgear.
LAM A oil production platform:
reconstruction of the platform’s power supply system with replacement of the 0.4 kV distribution board;
implementation of a full scope of works for commissioning the electrical installation for dry oil pipeline heating.
LAM 21 and LAM 28 oil production platforms:
modernization of the platforms’ power supply system with installation of a 0.4 kV modular container-type distribution board;
implementation of a full scope of works for commissioning an autonomous power supply system with three gas generators as the power source;
implementation of a synchronization and power sharing system for the three gas generators.