What was done

Booster compressor station Bilche Volytsia:

Full scope of works on the creation of the power supply system: design, manufacturing, installation and commissioning of the 0.4 kV control system equipment for gas-compressor unit GPA-TS-16 (station numbers 9, 10, 11, 12, 13, 14).
Design, manufacturing, installation and commissioning of the 0.4 kV power control board (ЩСУ) for gas-compressor unit GPA-TS-16 (station numbers 20, 21, 22, 23).

Booster compressor station Dashava:

Full scope of works on creating the power supply system: design, manufacturing, installation and commissioning of the 0.4 kV control station equipment for gas-compressor units No. 3, 4, 5, 6.
Development and implementation of a dispatching system for the power supply of the gas-compressor unit.
Gas-compressor unit with a capacity of 6.3 MW to ensure the operation of the 2 billion m³ storage facility, with a transportation volume of 6 million m³ per day.
Full scope of works: design, production, installation and commissioning of the power distribution and control system for gas-compressor units No. 1, 2, 3, 4 of the Dashava booster compressor station.

Compressor station CS-2 Dolyna:

design of the power supply system for the “Reconstruction of the DUG-II gas pipeline” project.

As part of the implementation of projects for Ukrtransgaz, 300 electrical cabinets were manufactured in a single batch at the S-Engineering plant. The implementation of the projects increased the productivity of the gas-compressor units by minimizing downtime.

Comprehensive project for reconstruction of KTP 2×1000 kVA CS “Berezivka” (2017).

Client:
SE Ukrtransgaz, LMG "Lvivtransgaz", Stryi PCHT, CGS "Bilche-Volytsia"
Year of cooperation:
2009-2011, 2017
Country of implementation:
Lviv region, Ukraine
Industry:
Oil and gas