LLC “Interpipe Niko Tube” (INTERPIPE)
What was done
A comprehensive set of works was completed for the reconstruction of the automatic control system for the heating of the roller furnace.
Design documentation was developed, equipment was supplied, calculations were carried out, measuring diaphragms were manufactured, restriction devices and actuators were installed, commissioning works, preliminary tests and trial operation of the system were performed.
Client:
LLC “Interpipe Niko Tube” (INTERPIPE)
Year of cooperation:
2014
Country of implementation:
Ukraine
Industry:
Industry