What was done
- Audit of the power supply system of the transshipment complex LLC “TIS-Ruda”.
- Audit of the power supply system of the transformer substation 18TP58.
- A set of works for the development of design documentation, supply of equipment, installation and commissioning for the implementation of a compensation capacitor unit at transformer substation 10/0.4 No. 58 of TIS-Ruda LLC.
- A set of works on the development of design documentation, supply of equipment, installation and commissioning for the implementation of an automatic transfer system at TP 10 / 0.4 No. 58 LLC “TIS-Ruda”.
- Audit of the power supply system of production facilities of TIS-Ugol LLC.